• Link to LinkedIn
  • Critical Communications
(913) 677-2884
KMEA
  • Home
  • About Us
    • History
    • Boards & Committees
      • Joint Board
      • KMEA Board of Directors
      • KMGA Board of Directors
      • KMEA Executive Committee
      • KMGA Executive Committee
    • Audit Reports
    • Annual Reports
    • Power Factor Newsletter
  • Members
    • KMEA Member Cities
    • KMGA Member Cities
    • Awards
  • Services
  • Power Supply Resources
    • Overview
    • EMP 1
    • EMP 2
    • EMP 3
    • WAPA Hydro Power Pool Project
    • GRDA
    • SPA Hydro Power Pool Project
    • Buckeye
    • Dogwood
    • Marshall
  • Resources
    • KMEA Resource Links
    • KMGA Resource Links
    • SPP Market Links
    • Login to Sharefile
    • Login to Glance
    • Videos
    • KMGA Videos
    • Electricity 101
    • Natural Gas 101
  • Events
    • 2025 Annual Conference Photos
    • 2026 Golf Outing and Joint EMP meeting Photos
  • Mid-States
  • Blog
  • Contact
  • Career Center
    • Job Opportunities
    • Post a Job Ad
  • Click to open the search input field Click to open the search input field Search
  • Menu Menu
Blog

Winter Storm Kingston: Breaking Records and Testing Limits

February 27, 2025/in General Information/by KMEA

 

As the forecasted cold weather loomed on February 6th, pipelines began posting Winter Weather notices effective from the 11th until further notice. This proactive measure was crucial in preparing for the severe conditions brought by Winter Storm Kingston. Throughout the storm, the situation intensified, leading two pipelines to elevate their notices to Operational Flow Orders (OFO), ensuring the stability and reliability of gas supply during this critical period.

The storm’s impact was particularly notable on February 20th, a day marked by several significant events. Many LMPs/pricing nodes in the SPP Marketplace surpassed $500/MWh between 5:30 am and 7:00 am, reflecting the extreme demand for electricity. The SPP set a new record winter peak of approximately 47,533 MW during the morning peak, surpassing the previous winter peak by nearly 400 MW. Additionally, 14 of KMEA’s registered units ran during the storm, generating a total of approximately 295 MW during the morning and early afternoon.

The extreme cold also shattered long-standing temperature records across Kansas on the morning of February 20th, breaking records that had stood for over 100 years. This unprecedented cold contributed to the Southern Star pipeline setting a new record, reaching 3.09 billion cubic feet of gas demand on their system. The same day also saw the highest gas usage for KMGA LDC cities during the storm, with consumption peaking at 23,534 MMBtu.

The energy sector’s response to Winter Storm Kingston underscores the importance of preparedness and adaptability in the face of extreme weather events.

Share this entry
  • Share on Facebook
  • Share on X
  • Share on WhatsApp
  • Share on LinkedIn
  • Share by Mail
https://kmea.com/wp-content/uploads/2025/02/K.png 258 333 KMEA http://kmea.com/wp-content/uploads/2015/08/KMEA-2015-LOGO-e1452287609185.png KMEA2025-02-27 15:51:382025-02-27 15:53:56Winter Storm Kingston: Breaking Records and Testing Limits

Sign up for the Power Factor Newsletter

Categories

  • Critical Communications
  • Employment Opportunities
  • General Information

CONTACT

6300 West 95th Street
Overland Park, KS 66212
Map and Directions

Phone: (913) 677-2884
Fax: (913) 677-0804
Email: info@kmea.com

Terms of Use

Sign up for the Power Factor Newsletter

RECENT BLOGS

  • 2026 KMEA/KMGA Annual Conference RecapNovember 16, 2026 - 12:27 pm
  • Bryan Knox receives the Mike Gilliland Honor AwardNovember 10, 2026 - 2:01 pm
  • Ethan Reimer receives the Ron Huxman Distinguished Service AwardNovember 10, 2026 - 1:55 pm
  • Max Krull recieves the inaugural Mike Muirhead Dedicated Service Award.November 9, 2026 - 1:54 pm
  • Stacie Eichem receives the 2026 Max Embree Distinguished Service Award.November 9, 2026 - 12:54 pm

There are no upcoming events.

View All Events
Copyright © , Kansas Municipal Energy Agency, All Rights Reserved
  • Link to LinkedIn
  • Home
  • About Us
  • Members
  • Services
  • Power Supply Resources
  • Resources
  • Events
  • Mid-States
  • Blog
  • Contact
  • Career Center
Link to: GRDA Modernizes Salina Pumped Storage Project for Future Demands Link to: GRDA Modernizes Salina Pumped Storage Project for Future Demands GRDA Modernizes Salina Pumped Storage Project for Future Demands Link to: KMEA Staff and Member Cities Attend APPA Legislative Rally in DC Link to: KMEA Staff and Member Cities Attend APPA Legislative Rally in DC KMEA Staff and Member Cities Attend APPA Legislative Rally in DC
Scroll to top Scroll to top Scroll to top