• Link to LinkedIn
  • Critical Communications
(913) 677-2884
KMEA
  • Home
  • About Us
    • History
    • Boards & Committees
      • Joint Board
      • KMEA Board of Directors
      • KMGA Board of Directors
      • KMEA Executive Committee
      • KMGA Executive Committee
    • Audit Reports
    • Annual Reports
    • Power Factor Newsletter
  • Members
    • KMEA Member Cities
    • KMGA Member Cities
    • Awards
  • Services
  • Power Supply Resources
    • Overview
    • EMP 1
    • EMP 2
    • EMP 3
    • WAPA Hydro Power Pool Project
    • GRDA
    • SPA Hydro Power Pool Project
    • Buckeye
    • Dogwood
    • Marshall
  • Resources
    • KMEA Resource Links
    • KMGA Resource Links
    • SPP Market Links
    • Login to Sharefile
    • Login to Glance
    • Videos
    • KMGA Videos
    • Electricity 101
    • Natural Gas 101
  • Events
    • 2025 Annual Conference Photos
    • 2026 Golf Outing and Joint EMP meeting Photos
  • Mid-States
  • Blog
  • Contact
  • Career Center
    • Job Opportunities
    • Post a Job Ad
  • Click to open the search input field Click to open the search input field Search
  • Menu Menu
Blog

NRC Approves Construction Permit for TerraPower’s Advanced Reactor

March 5, 2026/in General Information/by KMEA

The Nuclear Regulatory Commission has authorized its staff to issue TerraPower’s subsidiary, US SFR Owner, a construction permit for the Kemmerer Power Station Unit 1 in Wyoming—a significant milestone as it marks the first commercial reactor approval in nearly a decade and the first non–light water reactor approval in more than 40 years. NRC Chairman Ho Nieh called it a historic step, highlighting the agency’s rigorous, independent safety review. NRC staff completed their technical evaluation in under 18 months and, after a streamlined hearing process, the Commission determined that the application met all necessary safety and environmental requirements. TerraPower first filed the application in March 2024 for its 345‑MWe sodium‑cooled advanced reactor, which includes an energy storage system capable of boosting output to 500 MWe. Although the construction permit is expected soon, the company must still obtain a separate operating license before the facility can run. Safety and environmental reviews were completed in 2025, laying the groundwork for the next stage of the project.

Click HERE to read the full article.

Share this entry
  • Share on Facebook
  • Share on X
  • Share on WhatsApp
  • Share on LinkedIn
  • Share by Mail
https://kmea.com/wp-content/uploads/2026/03/shutterstock_2208691733-scaled-e1772735523553.jpg 687 1000 KMEA http://kmea.com/wp-content/uploads/2015/08/KMEA-2015-LOGO-e1452287609185.png KMEA2026-03-05 12:15:382026-03-05 12:34:55NRC Approves Construction Permit for TerraPower’s Advanced Reactor

Sign up for the Power Factor Newsletter

Categories

  • Critical Communications
  • Employment Opportunities
  • General Information

CONTACT

6300 West 95th Street
Overland Park, KS 66212
Map and Directions

Phone: (913) 677-2884
Fax: (913) 677-0804
Email: info@kmea.com

Terms of Use

Sign up for the Power Factor Newsletter

RECENT BLOGS

  • Bryan Knox receives the Mike Gilliland Honor AwardNovember 10, 2026 - 2:01 pm
  • Ethan Reimer receives the Ron Huxman Distinguished Service AwardNovember 10, 2026 - 1:55 pm
  • Max Krull recieves the inaugural Mike Muirhead Dedicated Service Award.November 9, 2026 - 1:54 pm
  • Stacie Eichem receives the 2026 Max Embree Distinguished Service Award.November 9, 2026 - 12:54 pm
  • Dale Schweiger receives the 2026 Gil Hanson Outstanding Service AwardNovember 9, 2026 - 12:49 pm

There are no upcoming events.

View All Events
Copyright © , Kansas Municipal Energy Agency, All Rights Reserved
  • Link to LinkedIn
  • Home
  • About Us
  • Members
  • Services
  • Power Supply Resources
  • Resources
  • Events
  • Mid-States
  • Blog
  • Contact
  • Career Center
Link to: Qatar’s LNG Shutdown Shakes Global Energy Markets Link to: Qatar’s LNG Shutdown Shakes Global Energy Markets Qatar’s LNG Shutdown Shakes Global Energy Markets Link to: PHMSA Announces NGDISM Grants to Upgrade Aging Natural Gas Infrastructure Link to: PHMSA Announces NGDISM Grants to Upgrade Aging Natural Gas Infrastructure PHMSA Announces NGDISM Grants to Upgrade Aging Natural Gas Infrastructure
Scroll to top Scroll to top Scroll to top